Prestige – By i2 Developments
A multi facility development located between Terminal 3 and Marina Mall. The development has:
- Lateral support for the perimeter of the excavation going 20 meters bellow the ground floor level
- 4 Underground parking levels
- 4 different structures with two of the buildings having a connecting bridge
- Theme Park
- Residential and commercial areas
The entire built area will exceed 80,000m2
The Summit – Elora Realty & Investments
A High end residential project located on Patrice Lumumba Road in Airport Residential, Accra. The project with two towers (a 14 and 12 floors) with an interconnected bridge connecting the two towers will tower over the Airport Residential skyline being located on top of the Hill.
Construction started in Early 2025 and will be ready for occupation in 2027
CBI – The World’s Largest Calcined Clay Cement Plant
The Worlds Largest Calcined Clay Plant Located in Tema.
Over 8,000m3 of Concrete works in addition to 6,000 tons of Structural Steel, Mechanical and Piping work executed. The tallest lift at 81m and the heaviest lift at over 60tons.
Star Cement
The Civil works at the Green Field Cement Girding Plant located in Tema. The scope extends across all civil and concrete structures required at a new facility that also include Three Slip form silo structures.
Water Treatment Plant Facility – Iduapriem Gold Mine
New Water Treatment Plant facility being built as an EPC Project with Proxa Water for AngloGold Ashanti at their Iduapriem Mine Site.